(888) 884-0887
Request a quote

Commercial LED
video walls

Handed the video wall project? We make it an easy win. The right wall for your space, a quote with no surprises, and one team from site survey to switch-on — with pricing in about a minute, not three weeks.

Get instant pricing.

An honest comparison

Three ways
to buy a wall

Most commercial buyers end up choosing between a general AV integrator who resells whatever their distributor stocks, an LED-only reseller shipping from a catalog, and a specialist who engineers the wall to the room.

 
General AV
integrator
LED-only
reseller
SeeThru
Pixel pitch sized to your actual sightlines
~Sometimes
You pick from catalog
Engineered to room
Site survey before the final quote
~Sometimes
Quoted from an email
Every project
Pricing before a sales call
Quote after meetings
Quote on request
Range in one minute
Pixel budget checked against your feed count
Rarely
Not offered
Checked automatically
Front-serviceable cabinets
~Depends on brand
Varies
Standard
Spare modules held in stock
Ordered on failure
Ordered on failure
Held for your build
One team from survey to switch-on
~Subcontracted
Shipped, not installed
Single team
Financing and multi-site rollout
~Case by case
Not offered
Up to 60 months
US-based support team
~Varies
Overseas factory
US-based
Corner-wrapped LED video wall in a daylit office lobby beside the reception desk

Holds its colour in full daylight, around the corner.

Office lobby
Why commercial teams choose SeeThru

Built around how a business actually runs.

IT- and AV-friendly operation

Your team runs the system, not a vendor. Clean AV-over-IP, Teams and Zoom integration, room-control presets, and a control surface anyone on the AV desk can drive.

Backup feed is one button away

Sized to the room, not the catalog

Pixel pitch is chosen from your closest viewer, your content and your wall width — not from whatever the distributor is clearing this quarter. The planner above runs the same maths we do.

Every size snaps to real cabinets

Serviceable for the next decade

Front-serviceable cabinets, modules held in stock, and a one-year warranty on parts and panels. A commercial wall is a capital asset — it should be repairable, not replaceable.

1-year parts & panel warranty

Priced before you are pitched

You get a range, a spec sheet and a cabinet layout before a salesperson calls. If the number does not work, you have lost a minute — not three meetings.

No obligation, no pressure
Service model

From first site walk to final switch-on.

One team guides the project from measurement to installation and handover — the same team whether it is a single boardroom or a twelve-site rollout.

01

Plan & conversation

Week 1

Use the planner above, then a 30-minute call to review sightlines, AV stack, wall structure and integration needs.

Instant price range 30-min call Written recommendation
02

Site survey & engineering

Week 2–3

On-site measurement, structural check and power/data planning. You receive a cabinet layout, load calculation and a line-item proposal.

On-site survey Cabinet layout Power & data plan Load calc
03

Build & staging

Week 4–9

Cabinets are built, burned in and staged before they ship. Processing and control are configured to your sources ahead of time.

Burn-in test Processor config Content test Staged build
04

Install & handover

Week 10–12

Installed around your operating hours, commissioned, then handed over with training for whoever drives it day to day.

Out-of-hours install Commissioning Team training Spares on site

Typical timeline: Most commercial LED projects run 8–12 weeks from first call to switch-on, depending on structural prep and lead time.

Branded welcome wall · Conference foyer Corporate
Ground-supported wall · Auditorium Venue
Freestanding displays · Expo floor Events
Brushed-metal trim · The finished edge Detail
Flush-mounted wall · Timber feature wall Feature wall
After you sign

Built so it never comes back on you.

The quote is the easy part. What protects you is what happens after: we survey the site before the final number, keep spares for your build on the shelf, and answer the phone in your time zone.

WARRANTY
1year

Parts and panels covered.

One year on parts and panels, with front-serviceable cabinets so a swap is minutes of work, not a teardown.

SUPPORT
USbased

A team you can reach.

Support is based in the United States. When something needs attention you talk to us, not a factory overseas.

SPARES
Instock

Spare modules on the shelf.

We keep spare modules in stock, so a failed module is a quick replacement instead of a wait on a shipment.

Pixel pitch, explained

The number that
fits the room.

Pixel pitch is the distance between LEDs — smaller numbers mean a sharper picture up close, and a higher price. The right pitch is the coarsest one nobody in the room can see.

P0.9
Control room & boardroom Dense dashboards and small text, read from a desk.
0.9 mm · 666 × 375 / cab
From 3 ft back
P1.25
Boardroom & close lobby Spreadsheets, shared screens, brand detail.
1.25 mm · 480 × 270 / cab
From 4 ft back
P1.5
Lobby & showroom Brand video and graphics at walk-up distance.
1.5 mm · 400 × 225 / cab
From 5 ft back
P1.86
Atrium & retail floor Motion-led content taken in from across a space.
1.86 mm · 322 × 181 / cab
From 6 ft back
P2.5
Concourse & ballroom Long sightlines where nobody stands close.
2.5 mm · 240 × 135 / cab
From 8 ft back
Slider LED Screen

Three walls, one system, one team behind it.

Ballroom & events
Questions we get every week

Asked & answered.

Most of your questions are ones we have answered before.

What does a commercial LED wall actually cost?

The planner above gives you a real range in about a minute — it prices the cabinets for your exact wall size and pixel pitch, with volume discounts already applied. As a rough anchor, a lobby wall around 16 × 9 ft lands in the mid five figures for hardware; a large control-room wall can run into six.

That range covers the LED cabinets. Structure, processing, content systems and installation are itemized separately in your proposal so you can see what is driving the number.

How do I know which pixel pitch I need?

It comes down to your closest viewer, your content and how wide the wall is. Finer pitch means you can stand closer before the pixel structure shows — and costs more per square foot.

The planner works it out from the answers you give and shows you the reasoning, including the two pitches either side of the recommendation so you can see the trade-off rather than take our word for it.

We run 16 camera feeds. Will they all be readable?

That is a resolution question, not a size question. Each readable feed needs roughly a quarter-HD tile, so 16 feeds need about 8.3 megapixels on the wall. Pick the control-room flow in the planner and it checks every pitch option against your feed count and tells you if the wall comes up short.

How long does installation take, and can you work around our hours?

For a typical lobby or boardroom install: 10 to 18 days on site, depending on rigging complexity and structural prep. We schedule around your business — commissioning after hours or over weekends when the floor is quiet.

We will not start an install we cannot finish with at least two weeks of buffer before your first event on the wall.

Can our own IT or AV team run it?

Yes — that is the design goal. Clean AV-over-IP, Teams and Zoom integration, room-control presets and a control surface anyone on the AV desk can drive. We hand over with training and leave documentation with the system.

What happens if a module fails in three years?

Cabinets are front-serviceable, so a module swap does not mean dismantling the wall or hiring a lift. We hold spare modules in stock matched to your specific build, and parts and panels are covered for a year.

Can you handle a multi-site rollout?

Yes. Standardising on one panel family across sites is usually cheaper per wall and much cheaper to support, because spares and training are shared. Tell us the site count on the planner and we will price the rollout rather than a single wall.

Is a window-facing screen bright enough to beat daylight?

Only if it is specified as a high-brightness build. If you tell the planner the screen faces out through glass, that flag rides along on your proposal automatically and we quote the brighter build rather than letting you discover the problem after install.

Start a conversation

30 minutes.
No quote until you ask.

Plan the wall first — it takes a minute and costs nothing. Then, if the number works, book a call with a SeeThru engineer to talk through your space, your timeline and what you have already been quoted.